The Quantitative and Qualitative Assessments of Investment Risk in Government Development Projects (Case Study: Joint Oil Fields of Iran and Iraq)

Document Type : Research Paper

Authors
Department of Financial Engineering, College of Management, University of Tehran, Tehran, Iran
Abstract
Common energy fields are one of the defining poles of energy diplomacy between countries. Iran's role with 28 common oil and gas fields in the Middle East, the world's fastest energy pole and the largest source of oil and gas, is very decisive. Among Iran's neighbors, Iraq is very important with the largest number of common fields. This study presented a qualitative and quantitative project risk assessment using a risk assessment matrix and the expected monetary value risk analysis to identify the most important risks of joint oil field projects. Accordingly, the two scenarios of the contract for the partnership in the production of the Sepehr and Jafir oil fields are compared with the oil contract for the buyback of the North Azadegan field by calculating the Expected Monetary Value for each Decision Tree Path. As a result, it is observed that by considering the risks obtained from the calculations of the risk assessment matrix in each contract, and also with the equal risk share, the production sharing contract has an expected monetary value equal to 7.228 billion dollars. This option also includes the lowest investment risk for National Oil. Also, by using the risk assessment matrix, we found that political conflicts are the largest share of risk and a deterrent to the development of oil fields, and the willingness of large oil companies to invest in Iraqi oil facilities confirms that the importance of political conflicts is much greater than lack of physical infrastructure risk.
Keywords
Subjects

Alijanzadeh, M., & Azadnia, A. (2016). Identify Risks and Introduce Risk Assessment Techniques in Crude Oil Pipeline Projects, Petroleum Products, and Natural Gas. Retrieved from https://civilica.com/doc/695022/.
Chiara, N., & Garvin, M. J. (2008). Variance Models for Project Financial Risk Analysis with Applications to Greenfield BOT Highway Projects. Construction Management And Economics, 26(9), 925-939.
Chinniah, Y., Gauthier, F., Aucourt, B., & Burlet-Vienney, D. (2018). Validation of the Impact of Architectural Flaws in Six Machine Risk Estimation Tools. Safety Science, 101(September 2017), 248-259.
Choi, B., & Kim, S. T. (2018). Price Volatility and Risk Management of Oil and Gas Companies: Evidence from Oil and Gas Project Finance Deals. Energy Economics, 76, 594-605.
Furlong, C., De Silva, S., Gan, K., Guthrie, L., & Considine, R. (2017). Risk Management, Financial Evaluation and Funding for Wastewater and Stormwater Reuse Projects. Journal of Environmental Management, 191(January 2021), 83-95.
Hosny, H. E., Ibrahim, A. H., & Fraig, R. F. (2018). Risk Management Framework for Continuous Flight Auger Piles Construction in Egypt. Alexandria Engineering Journal, 57(4), 2667-2677.
Keshk, A. M., Maarouf, I., & Annany, Y. (2018). Special Studies in Management of Construction Project Risks, Risk Concept, Plan Building, Risk Quantitative and Qualitative Analysis, Risk Response Strategies. Alexandria Engineering Journal, 57(4), 3179-3187.
Khalilzadeh, M., Shakeri, H., & Zohrehvandi, S. (2021). Risk Identification and Assessment with The Fuzzy DEMATEL-ANP Method in Oil and Gas Projects under Uncertainty. Procedia Computer Science, 181, 277-284. 
Kraidi, L., Shah, R., Matipa, W., & Borthwick, F. (2019). Analyzing the Critical Risk Factors Associated with Oil and Gas Pipeline Projects in Iraq. International Journal of Critical Infrastructure Protection, 24, 14-22.
Noori, J., & Khoshchehre, F. (2016). Obstacles and Solutions for Exploiting Iran’s Common Oil and Gas Fields. Energy Law Studies, 2(2), 323-346.
Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (6th Ed.). Retrieved from Project Management Institute.
Raei, R., Falahpour, S., & Amerimatin, H. (2012). Financial Risk Assessment Model of LNG Projects - Applicable Case: Iran LNG Project. Financial Research, 14(34), 47-64.
Supriyadi, R. A. (2013). On the Use of Risk and Uncertainty Analysis in Conceptual Stage of Petroleum Project (Master's Thesis, University of Stavanger, Norway). Retrieved from https://uis.brage.unit.no/uis-xmlui/bitstream/handle/11250/182251/Supriyadi_Ricky_Agus.pdf?sequence=1.
Szymański, P. (2017). Risk Management in Construction Projects. Procedia Engineering, 208(January), 174-182.
Xie, G., Yue, W., Wang, S., & Lai, K. K. (2010). Dynamic Risk Management in Petroleum Project Investment Based on a Variable Precision Rough Set Model. Technological Forecasting and Social Change, 77(6), 891-901.